From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of chassis parts relating to a higher radiator, bonnet, and dash.

Identifier  ExFiles\Box 15\1\  Scan056
Date  13th July 1928
  
RR 785 REVISED (10H) (D.C. 777-20-2-28) M C.LTD
X7250
COMPLETED 25.9.28
STANDARDISATION of CHASSIS PARTS.
Date 13.7.28
Description of Parts. HIGHER RADIATOR, BONNET & DASH.
Origin. To improve appearance.
Experimental Test Report. The radiator is raised 1" - the dashboard .400". The alteration is made only to improve the appearance.
Road Test Report. The only car fitted with this has been despatched to Sales - they have approved.
X No. 7250
Drawing No. 7260
Part List
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.
Weight of Old Part.
Cost of Old Part. £ 27-2-1
Weight of New Part.
Cost of New Part. £ 28-6-9
Difference per Car.
Difference per Car. £1-4-8 Increase per chassis
Signature from Cost Dept. that above is correct. GKM 19/7/28 Hbr. 18-9-28 G/19/9/28
Cost of Parts in Works which will be scrapped if commenced on:-
Series.......£.......
Series.......£.......
Series.......£.......
[STAMP: CANTON... ROLLS ROYCE... 20 JUL 1928]
INITIAL DATE REMARKS
BJ. 25 9 28 Agreed. T
R.{Sir Henry Royce} 14.7.28 Agreed. FHR.
WOR.{Arthur Wormald - General Works Manager} 17.7.28 Agreed. Wor.{Arthur Wormald - General Works Manager}
RG.{Mr Rowledge} 16.7.28 Agreed. RG.{Mr Rowledge}
DA.{Bernard Day - Chassis Design} 18.7.28 Agreed. Da.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer} 16.7.28 Agreed. BY.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer} 13.7.28 Agreed. EP.{G. Eric Platford - Chief Quality Engineer}
E.{Mr Elliott - Chief Engineer} 14.7.28 Agreed. E.{Mr Elliott - Chief Engineer}
PN.{Mr Northey} 25.7.28 Agreed. PN.{Mr Northey}
CWB. 17.7.28 Agreed. CWB. It is understood that dash is raised .4" at crown and 1" at sides and is 1.5" wider.
HS.{Lord Ernest Hives - Chair} 13.7.28 Agreed. HS.{Lord Ernest Hives - Chair} Final curve between corners and crown remains to be settled.
  
  