From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Programme detailing the production status of various components for the Silver Wraith 50.
Identifier | ExFiles\Box 109\1\ scan0013 | |
Date | 1st July 1938 guessed | |
PROGRAMME. Silver Wraith 50. Designs (Ev{Ivan Evernden - coachwork}). Details and how produced. Frame Sides & Cross,etc. + Altered blueprints of details-traced in Tracing Office. Front Pan, and Mod. Gusset. ⊕ Detailed by Da{Bernard Day - Chassis Design}/DB.{Donald Bastow - Suspensions} Rear Spring. + Detailed by Ba/DB.{Donald Bastow - Suspensions} Rear Spring Fixings. + Altered blueprints of the details - traced in Tracing Office. Petrol Tank. Altered blueprints of details - traced in Tracing Office. Radiator. ⊕ Details of shutter base casting by Prod. D.O. - Wraith 3 shell and shutters supplied by W. to Marstons who will make the radiator from the schemes. Bonnet & Valance. Can be made from schemes - no details required Headlamps - horns,etc. No details, all B.3. pieces. Front Roll Rod. □ Mod. detail of rod - alter blueprints of details - traced. Dashboard. Detail of mod. pressing at steering column - Prod. D.O. Raised Spare Wheel Carrier. □ Altered blueprints of details - traced in Tracing Office. | ||