REPORT ON PRODUCTION ON B.5 PRODUCTION.

Since my last report in June on the above,
Motor Panels have written to say that they are unable to
let us have set of framework by July 15th. as promised.
This is due to work on certain of the tools not being so
far advanced as they had anticipated. They have now given
us a date of August 4th. for Framework and August 19th.
for Panels.

I think, from the information which I gained during
my last visit to their Works last week, that the real cause
of the hold-up is that they have not been able to get
certain machines installed as early as they had anticipated.

We have received one pair of rear wings from them
which appear generally to be a very good job. There are,
however, one or two points which need correction, which I
shall take up with them when I visit their Works tomorrow.
If we can take these as the standard of the workmanship
that will be given throughout the job, I think that it
will be generally satisfactory.

Motor Panels have asked us for sundry jigs to
enable them to check shapes and help in their assembly of
components. These have been made and despatched to them.

We have designed a body truck for our line production
and had prints sent out to various manufacturers for quotations.

The alterations to the Paint Shop are in progress.
  
  