Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Fault with the starter gear friction plate and the solution of fitting an extra fibre washer.

Identifier  ExFiles\Box 75\5\  scan0042
Date  8th May 1920
  
SPT. from BY.{R.W. Bailey - Chief Engineer}
c. EP.{G. Eric Platford - Chief Quality Engineer}
c. Hs.{Lord Ernest Hives - Chair}
c. Bp.
15 EFC
X.3350
COPY.
BY6/P8.5.20.

X.3426 CHASSIS - STARTER GEAR ON GEARBOX - SEC.6060
RE FAULT DUE TO THE FRICTION PLATE NOT BEING SUFFICIENTLY STRONG.
X.3350

Referring to EP{G. Eric Platford - Chief Quality Engineer}Ø/F7.5.20., I am certainly of the opinion that under present conditions we should turn out the above drives locked solid. In order to enable the Works to do this they should fit an extra fibre washer and tighten the whole thing up solid. The extra fibre washer to use will be G.3504.

The above point was agreed to at the conference in Wor{Arthur Wormald - General Works Manager}'s office yesterday.

BY.{R.W. Bailey - Chief Engineer}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙