Outlining the timeline for the production of higher lift cams for a P.2. model.


Identifier  ExFiles\Box 13\2\  02-page070
Date  27th May 1931
  
E
c. Eg.
c. Wor. {Arthur Wormald - General Works Manager}
c. Hs. {Lord Ernest Hives - Chair}
c. RHC. {R. H. Coverley - Production Engineer}

8709D BY15/C.27.5.31.

RE: HIGHER LIFT CAMS FOR P.2.
---------------------------

With reference to E2/M23.5.31. we have discussed this matter with RHC. {R. H. Coverley - Production Engineer} , and he states that it would take about 10 days from receipt of drawings in which to produce the cam forms. The calculations and drawings would take 4 days, so that the actual forms should be available in 14 days from instructions to proceed.

BY. {R.W. Bailey - Chief Engineer} BM
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙