Outlining the timeline for the production of higher lift cams for a P.2. model.

Identifier  ExFiles\Box 13\2\  02-page070
Date  27th May 1931
  
E
c. Eg.
c. Wor.{Arthur Wormald - General Works Manager}
c. Hs.{Lord Ernest Hives - Chair}
c. RHC.{R. H. Coverley - Production Engineer}

8709D BY15/C.27.5.31.

RE: HIGHER LIFT CAMS FOR P.2.
---------------------------

With reference to E2/M23.5.31. we have discussed this matter with RHC.{R. H. Coverley - Production Engineer}, and he states that it would take about 10 days from receipt of drawings in which to produce the cam forms. The calculations and drawings would take 4 days, so that the actual forms should be available in 14 days from instructions to proceed.

BY.{R.W. Bailey - Chief Engineer} BM
  
  