Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation document for securing a distribution box cover with thumb screws.

Identifier  ExFiles\Box 65\2\  scan0102
Date  22th September 1926
  
RR 755 (10H) (DB {Donald Bastow - Suspensions} 130 12-9-24) MS 301225

X7740

COMPLETED 20.10.26

STANDARDISATION of CHASSIS PARTS.

Date 22.9.26

Description of Parts: DISTRIBUTION BOX COVER SECURED IN POSITION BY ROUND THUMB SCREWS.

Origin: Facilitation of removal and replacement.

Experimental Test Report: This appears to be a much more convenient arrangement. Has run 10,000 miles on 12-EX and several thousand on 9-G-111.

Road Test Report: Easy of access when necessary to change fuses at night.

Drawing No.

Part List

X No. 7740

[X mark next to D]
A Scrap and replace at all costs including Chassis already delivered to customers.
B Scrap and replace on Chassis in works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock. Alteration effective on future Chassis.

Weight of Old Part.
Cost of Old Part. £
Weight of New Part.
Cost of New Part. £
Difference per Car: Negligible
Difference per Car: £ Negligible

Cost of Parts in Works which will be scrapped if commenced on:-
Series .......£.......
Series .......£.......
Series .......£.......

Signature of Mr. De LOOZE that above is correct: My/RB {R. Bowen} , 19.10.26.

SIGNATURES | DATE | REMARKS
--- | --- | ---
MR. C.W.B. | 24.9.26 | Agreed, can we have this on 20 HP. also CWB.
MR. B. JOHNSON | 24.9.26 | Agreed.
MR. ROYCE | 24.9.26 | Agreed. FHR.
MR. WORMALD | 22.9.26 | Agreed. Wor. {Arthur Wormald - General Works Manager}
MR. ROWLEDGE | 22.9.26 | Agreed. Rg. {Mr Rowledge}
MR. DAY | 24.9.26 | Agreed. Da. {Bernard Day - Chassis Design}
MR. BAILEY | 11.10.26 | Agreed. BY. {R.W. Bailey - Chief Engineer}
MR. PLATFORD | 22.9.26 | Agreed. EP. {G. Eric Platford - Chief Quality Engineer}
MR. ELLIOTT | 25.9.26 | Agreed. E. {Mr Elliott - Chief Engineer}
MR. NORTHEY | 23.9.26 | Agreed. PN. {Mr Northey}
MR. HIVES | 22.9.26 | Agreed. Hs. {Lord Ernest Hives - Chair}

[Stamped text: PHANTOM CHASSIS]
[Stamped text in circle: 20.]
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙