Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Status of chassis and coachwork projects, and listing required specifications for various models and components.

Identifier  ExFiles\Box 133\4\  scan0300
Date  3rd January 1944
  
CONFIDENTIAL
1125

To. Rm.{William Robotham - Chief Engineer} from Ev{Ivan Evernden - coachwork}/JD.{J. Draper - Frames}
Ev{Ivan Evernden - coachwork}/JD.{J. Draper - Frames}7/GAB.3.1.44.

c. to. Ev.{Ivan Evernden - coachwork}

Chassis Work

The following chassis and coachwork is in hand:-

Silver Ripple.
1/16 Scale Close Coupled Saloon. - Silver Ripple - W.Allen.
Full Scale Outline of Body. - Silver Ripple - Grover.
1/4 Scale Layout of Chassis. - Silver Ripple - Peak.
1/4 Scale Layout of Chassis Rear End - Silver Ripple - Hunt.
Jacking Projects. - Silver Ripple - Aspley.

A list of designs outstanding to produce a Silver Ripple Chassis was issued under cover of memo. Ev{Ivan Evernden - coachwork}/JD.{J. Draper - Frames}6/GAB.22.12.43. (copy attached). Ev{Ivan Evernden - coachwork}/MGA{M. G. Aspley} is producing a specification for Silver Ripple which will entail some additional designs over and above those noted in the above mentioned memo.

Myth.
The following finalised designs are required for Myth:-
Engine Wire Fittings.
Exhaust system rear and intermediate suspension links.
Engine Controls.
Steering Wheel.
Petrol Piping.
Chassis Lubrication.
Instrument Board.
Wiring and Fittings.

The following chassis items also require attention:-
1. Radiator Steam Valve - B.5. and Myth.
2. Cylinder blocks require a suitable facing in order that they can be bolted to assembly trestles.
3. Investigate the new rim sizes as shewn on Drg.TR{Capt. F. W. Turner - Finance}10.30.40.L.1.
4. Jacking Systems for Rationalised range.
5. Direct Braking Saloon Ripple.
6. Proofed Fabric Gaiters - Myth.
7. Rationalised Petrol Tanks, 14 gallons, 18 gallons, and 22 gallons.
8. Specification for Myth Engine with alternative head.
9. Specification B.60. Engine CI.
10. Specification B.80. Engine CI.
11. Specification B.80. Engine Alum.
12. Specification B.40. Engine - Silver Ripple.
13. Specification for Silver Phantom.
14. Specification for Silver Wraith.
15. Specification for Comet.
16. Specification for Cresta.
17. Specification for Corniche.

Ev{Ivan Evernden - coachwork}/JD.{J. Draper - Frames}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙