Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Bar chart tracking complaints and modifications for the Bentley 4¼ Litre engine from July to December 1938.

Identifier  ExFiles\Box 107\2\  scan0081
Date  1st December 1938
  
CHART OF COMPLAINTS
4¼ BENTLEY

TIMELINE: 1938, JULY, AUG, SEPT, OCT, NOV, DEC

LEFT COLUMN INITIALS: SG{Arthur F. Sidgreaves - MD}, HS{Lord Ernest Hives - Chair}, C, BY, RM{William Robotham - Chief Engineer}, MX{John H Maddocks - Chief Proving Officer}, R.H.C, H, HD{Mr Hayward/Mr Huddy}, SR, L.A., K/KC., GWH{George W. Hancock - Head Chateauroux}/K

ROW 1:
CATEGORY: ENGINE BEARING
SECTION: MOD B, TAKING SLACK OUT OF BEARINGS ONLY
COMPLAINT: COMPLAINT OF THUMP BY TESTERS AND OWNERS
DATA: JULY (10), AUG (8), SEPT (4), OCT (2)
REFERENCES: RPT DW. 252, REPORTS, P.133, P.132, P.131, P.128, W.264, W.263, W.260, W.253, W.279

ROW 2:
SECTION: MOD C, DRILLING OF CRANKSHAFT
COMPLAINT: COMPLAINT OF THUMP BY TESTERS AND OWNERS
DATA: JULY (NIL), AUG (REPORT P.109), SEPT (10), OCT (K), NOV (K), DEC (4)
NOTES/REFERENCES: A.C.P. FAILURE, DW.253, A.C.P. BEARINGS CHANGED NOT INCLUDED, P.135, W.277, W.278, W.275

ROW 3:
SECTION: ENGINE ROUGHNESS AND TIMING GEAR RATTLE, 1750 - 3000 R.P.M.
SUMMARY: DEALT WITH BY ATTENTION TO CRANKSHAFT DAMPER.
DATA: JULY (TIMING GEARS ROUGH 2, 2), AUG (T.G, E.R. 6, 2), SEPT (E.R., T.G 5, 5), OCT (T.G, ER 10, 3), NOV (T.G, R 10, 7), DEC (T.G, R 9, 6)
REFERENCES: W.277, W.281

ROW 4:
SECTION: DETONATIONS
DATA: AUG (5), SEPT (5), NOV (2), DEC (2)
REFERENCE: W.282
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙