From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Vehicle defects and their causes for the September quarter and the previous six months.
Identifier | ExFiles\Box 130\1\ scan0285 | |
Date | 30th September 1935 guessed | |
- 9 - DEFECTIVE SPEEDOMETER. TOTAL. REMARKS. September Quarter. C.C. 22) C.P. -) 22 Noisy cables due to bends or defective trips. Previous Quarter. C.C. 30) C.P. -) 30 Six Months. 52 DEFECTIVE HEADLAMPS. september quarter. C.C. 23) C.P. -) 23 Chiefly defective dipper gear, poor contacts or broken feed wire. Previous quarter. C.C. 37) C.P. 3) 40 Six Months. 63 INSUFFICIENT CLEARANCE OVER PROPELLER SHAFT. september quarter. C.C. 6) C.P. -) 6 Aggravated by weak road springs. Rubber buffers are to be increased in depth. Previous Quarter. C.C. 6) C.P. 2) 8 Six Months. 14 WATER LEAKS FROM ENGINE. september quarter. C.C. 6) C.P. 32) 38 Chiefly from No. 2 water jacket plate. Previous Quarter. C.C. 9) C.P. 40) 49 Six Months. 87 | ||