Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of a petrol tank to increase ground clearance.

Identifier  ExFiles\Box 106\2\  scan0042
Date  26th March 1929
  
RR 755 REVISED (10H). (D.C. 777-29-2-28) M.C L.TD
X5460 COMPLETED 29.5.29
STANDARDISATION of CHASSIS PARTS.
Date 26.3.29
Description of Parts. PETROL TANK. F.56268.
X No. 5460
Drawing No.
Part List
Origin. To increase ground clearance.
Experimental Test Report.
Road Test Report.
Run 10,000 miles on 14-G4. Now running a second 10,000 miles on 17-G4.
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.
Weight of Old Part.
Cost of Old Part. £ 9-6-1
Weight of New Part.
Cost of New Part. £ 11-17-4
Difference per Car.
Difference per Car. £ 2-11-3 increase
Signature from Cost Dept. that above is correct. G R H 27/5/29
Handwritten note: No 1. G.M. q. 428/5/29.
Cost of Parts in Works which will be scrapped if commenced on:-
Series.........£.........
Series.........£.........
Series.........£.........
STAMP: 20. H.P. CHASSIS
STAMP: J.C.M. DEPT. Received 28 MAY 1929
INITIAL
DATE
REMARKS
SG.{Arthur F. Sidgreaves - MD}
29-5-29
Agreed SG.{Arthur F. Sidgreaves - MD}
R.{Sir Henry Royce}
22.4.29
Agreed. FHR.
WOR.{Arthur Wormald - General Works Manager}
26.3.29
Agreed. Wor.{Arthur Wormald - General Works Manager}
RG.{Mr Rowledge}
3.4.29
Agreed. RG.{Mr Rowledge}
DA.{Bernard Day - Chassis Design}
4.4.29
Agreed. DA.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer}
28.3.29
Agreed. BY.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer}
27.3.29
Agreed. EP.{G. Eric Platford - Chief Quality Engineer}
E.{Mr Elliott - Chief Engineer}
10.4.29
Agreed. E.{Mr Elliott - Chief Engineer}
PN.{Mr Northey}
11.4.29
Agreed. PN.{Mr Northey}
CWB.
29.3.29
Agreed. CWB.
Hs.{Lord Ernest Hives - Chair}
26.3.29.
Agreed. Hs.{Lord Ernest Hives - Chair} Rm.{William Robotham - Chief Engineer}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙