From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
The schedule for issuing drawings for the radiator, shutters, and bonnet for a 'long distance job'.
Identifier | ExFiles\Box 111\4\ scan0149 | |
Date | 23th May 1939 | |
800a HPS{Horace Percy Smith - Experimental Factory Mgr}/WSC.{W. S. Cassel} from Rm.{William Robotham - Chief Engineer} Rm{William Robotham - Chief Engineer}1/R.23.5.39. We understand that the drawings of the radiator and shutters will be issued on Thursday, May 25th, the bonnet details will be completed by Friday, June 2nd. We think that these dates should enable the bonnet to keep pace with the radiator, which, of course, is the long distance job. Rm.{William Robotham - Chief Engineer} | ||