From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Parts list with drawing numbers, material specifications, costs, and bonus time allowances.
Identifier | ExFiles\Box 152\2\ scan0058 | |
Date | 21th October 1937 guessed | |
-2- Description of piece. | Drg.No. | No. off. | Material and Material Cost. | Bonus T.A. ---|---|---|---|--- Front bush. | 493.Z. | 1 | BZ/PC. .495 | 12 mins. Rear bush. | 494.Z. | 1 | BZ/PC. .25 | 10 mins. Gland rubber. | 520.Z. | 1 | Bought out. .125 | - Valve Thimble. | 480.Z. | 2 | B.O. .203 | - Bearing plate. | 519.Z. | 1 | B.O. .020 | - Lid {A. J. Lidsey} Screw. | 534.Z. | 5 | S/M. .045 | 3 1/2 mins. 1/8 plug. | 533.Z. | 2 | In assem. .002 | - Stud. | 536.Z. | 1 | S/M. .010 | 2 1/2 mins. Body. | 416.Z. | 1 | A. {Mr Adams} 4/6 | 76 mins. ASSEMBLY. | - | - | - | 90 mins. Cover. | 471.Z. | 1 | A. {Mr Adams} .666 | 14 1/2 mins. Spring | 535.Z. | 1 | 1d. | - Piston. | 477.Z. | 2 | Stamping. 1/1 for two. | 44 mins. Lever. | 474.Z. | 1 | 6d. | 65 mins. Connecting rod. | 475.Z. | 2 | 7d. | 12 mins. Spindle. | 466.Z. | 1 | .200 | 68 mins. continued | ||