Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Measuring the frame deflection on a 20 HP frame with a static load.

Identifier  ExFiles\Box 75\3\  scan0357
Date  10th October 1923
  
R.R. 493 (40 H) (SL 42 12-7-23). J.H., D.{John DeLooze - Company Secretary}
X4260
EXPERIMENTAL REPORT.
COPIES TO: R.C.J BJ. WOR.{Arthur Wormald - General Works Manager} By E.{Mr Elliott - Chief Engineer} Da.{Bernard Day - Chassis Design} EP.{G. Eric Platford - Chief Quality Engineer} P.N. OY.
Expl. No. X.4228
REF. Hs{Lord Ernest Hives - Chair}3/LG10.10.23.
OBJECT OF TEST.
To measure frame deflection on 20 HP. frame with static load.
TESTER.
E.{Mr Elliott - Chief Engineer} Halliday.
CONDITIONS.
20 HP. chassis with frame, axles, engine and crankcase fitted.
SUMMARY OF TEST.
Attached herewith are prints F.52766 and F.52767 which give results of tests (detail of frame stiffener).
We are anxious to know which type of frame stiffeners we should fix to 4-Goshawk-11.
Hs.{Lord Ernest Hives - Chair}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙