Rolls-Royce Archives
         « Prev  Box Series  Next »        

Two-part spring plunger for the Spectre Front Spring Assembly.


Identifier  ExFiles\Box 95\3\  scan0103
Date  25th June 1935
  
Rm {William Robotham - Chief Engineer} X346
To BY. {R.W. Bailey - Chief Engineer} from Da. {Bernard Day - Chassis Design}
SECRET
Da. {Bernard Day - Chassis Design} 2/HP.25.6.35.
c.c. E. {Mr Elliott - Chief Engineer} Hs. {Lord Ernest Hives - Chair} Hdv. PHG
Spectre(Codename for Phantom III) Front Spring Assembly.
Herewith is N. Sch.4551 shewing the spring plunger in the unit construction shock damper arrangement now being fitted to the first 8 cars, made in two parts, so as to give a bronze shock damper piston and a hardened steel face for the main spring rollers to work on. This should be done on the 8 cars now being built.
N.Sch.4551 hrewiith.
Da. {Bernard Day - Chassis Design}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙