Standardisation of Morganite EG2 grade brushes for 40/50 & 'S.S.' dynamos as an alternative.


Identifier  ExFiles\Box 172\3\  img122
Date  14th March 1929
  
RR 758 REVISED (10M) (D.C. 777-29-2-28) M.C.LTD
X 8673
COMPLETED 9.7.29
STANDARDISATION of CHASSIS PARTS.
Date 14.3.29
Description of Parts. MORGANITE EG2 GRADE BRUSHES FOR 40/50 & 'S.S.' DYNAMOS (as an alternative to present standard grade Le Carbone brushes).
Origin. Desirability of second source of supply - particularly a British source.

Experimental Test Report.
Morganite EG2 material is the nearest equivalent of LeCarbone grade Z., being hard graphitic and having a specific resistance of .0012 ohm. per inch cube.
It has been carefully proved on the new 28 slot armatures that these brushes are equally good with standard.
See report EFCl/T7.2.29.

Road Test Report.

Weight of Old Part. Cost of Old Part. £ 0. 4. 5
Weight of New Part. Cost of New Part. £ 0. 4. 5¼
Difference per Car. Difference per Car. £ Negligible.
Signature from Cost Dept. that above is correct. G {Mr Griffiths - Chief Accountant / Mr Gnapp} /Rb. {R. Bowen} 6.7.29. Wor. {Arthur Wormald - General Works Manager}

X No. 8673 7570
Drawing No.
Part List
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.

Cost of Parts in Works which will be scrapped if commenced on :-
Series.........£.......
Series.........£.......
Series.........£.......

INITIAL | DATE | REMARKS
SG. {Arthur F. Sidgreaves - MD} | 9.7.29 | Agreed. SG. {Arthur F. Sidgreaves - MD}
R. {Sir Henry Royce} | 18.3.29 | Agree. MIR. but I should be very certain before changing if what we have is giving complete satisfaction. R. {Sir Henry Royce}
WOR. {Arthur Wormald - General Works Manager} | 15.3.29 | Agreed. Wor. {Arthur Wormald - General Works Manager}
RG. {Mr Rowledge} | 18.3.29 | Agreed. RG. {Mr Rowledge}
DA. {Bernard Day - Chassis Design} | 22.3.29 | Agreed. Da. {Bernard Day - Chassis Design}
BY. {R.W. Bailey - Chief Engineer} | 14.3.29 | Agreed. BY. {R.W. Bailey - Chief Engineer}
EP. {G. Eric Platford - Chief Quality Engineer} | 14.3.29 | What road tests taken re. 10,000 miles. EP. {G. Eric Platford - Chief Quality Engineer}
E. {Mr Elliott - Chief Engineer} | 16.3.29 | Agreed. E. {Mr Elliott - Chief Engineer}
PN. {Mr Northey} | 27.5.29 | Agreed. PN. {Mr Northey}
CWB. | |
HS. {Lord Ernest Hives - Chair} | 14.3.29 | Agreed. Hs. {Lord Ernest Hives - Chair}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙