Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Request to build up the front dampers for the Bentley III Bumper Chassis using specific parts.

Identifier  ExFiles\Box 119\1\  scan0121
Date  9th July 1938
  
1024

To HPS.{Horace Percy Smith - Experimental Factory Mgr}
c. c. to HPS{Horace Percy Smith - Experimental Factory Mgr}/WB.{Mr Brazier/Mr Bell}

Rm{William Robotham - Chief Engineer}/Clm.{D. D. Clapham}2/JH.9.7.38.

BENTLEY III BUMPER CHASSIS.

Will you please have the front dampers built up as soon as possible. The special parts to be tested are knurled shafts (EXS.704) and high interference pins in the pistons. These parts are now ready for assembly.

Rm{William Robotham - Chief Engineer}/Clapham.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙