From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Request to build up the front dampers for the Bentley III Bumper Chassis using specific parts.
Identifier | ExFiles\Box 119\1\ scan0121 | |
Date | 9th July 1938 | |
1024 To HPS.{Horace Percy Smith - Experimental Factory Mgr} c. c. to HPS{Horace Percy Smith - Experimental Factory Mgr}/WB.{Mr Brazier/Mr Bell} Rm{William Robotham - Chief Engineer}/Clm.{D. D. Clapham}2/JH.9.7.38. BENTLEY III BUMPER CHASSIS. Will you please have the front dampers built up as soon as possible. The special parts to be tested are knurled shafts (EXS.704) and high interference pins in the pistons. These parts are now ready for assembly. Rm{William Robotham - Chief Engineer}/Clapham. | ||