Rolls-Royce Archives
         « Prev  Box Series  Next »        

To halt work on the Bentley 5 oil pump relief valve and oil pipes due to a pending modification to the cross steering tube.


Identifier  ExFiles\Box 149\2\  scan0184
Date  13th March 1939
  
1265

To: BY {R.W. Bailey - Chief Engineer} /CS
c. to Rm {William Robotham - Chief Engineer} /Gry. {Shadwell Grylls}

BY {R.W. Bailey - Chief Engineer} /NS. {Norman Scott} 3/MG.13.3.39

BENTLEY 5

EXPERIMENTAL PRODUCTION AND PRODUCTION

OIL PUMP RELIEF VALVE AND OIL PIPES

Please hold up work on the above.

Modification to the Cross Steering Tube will probably necessitate alterations.

BY {R.W. Bailey - Chief Engineer} /NS {Norman Scott}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙