From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Cost analysis for two separate engine jobs, detailing labour hours, rates, and material costs.
Identifier | ExFiles\Box 107\2\ scan0060 | |
Date | 3rd May 1938 guessed | |
B BEN B107JY Engine Fitter skilled 9 1/2 hrs @ 1s. 9d; semi 9 1/2 hrs @ 11d. Costs: 16s 7 1/2d and 8s 8 1/2d Cleaning carb etc. 3 1/2 hrs @ 1s. 3d. Cost: 4s 4 1/2d Adjust tappets after test and final test. 3 hrs @ 1s. 7d. Cost: 4s 9d To Wash Total hrs: 16 skilled, 9 1/2 semi. Total Labour Cost: £1 14s 5 1/2d Actual cost for Labour: £1 14s 5 1/2d Material: 19s 0 1/2d Total: £2 13s 6d B179JY Engine Fitters skilled 8 3/4 hrs @ 1s. 6d; semi 8 3/4 hrs @ 1s. 3d. Costs: 13s 1 1/2d and 10s 11 1/4d Cleaning carb etc. 3 1/2 hrs @ 1s. 3d. Cost: 4s 4 1/2d Adjust tappets etc after test. 1/2 hr @ 1s. 6d and 1/2 hr @ 1s. 3d. Cost: 1s 4 1/2d Test 2 hrs @ 1s. 8d. Cost: 3s 4d To Wash Total hrs skilled 14 3/4, semi 9 1/4. Total Labour Cost: £1 13s 1 3/4d Actual cost for Labour: £1 13s 1 3/4d Material: 19s 10 1/2d Total: £2 13s 0 1/4d | ||