Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Continuation of testing procedures for a relay switch unit, including spring tension and voltage breakdown tests.

Identifier  ExFiles\Box 70\4\  scan0141
Date  5th March 1925
  
contd : -4- EFC4/E5.3.25.
----------
X8781 ms

(5) Now verify that the main spring tension (combined rating and set) is such that with a current of 3.0 amperes passing through the fine winding, a load of at least 3.0 lbs. measured at the core on a spring balance is required to break contact of the lower contacts.

(6) Whilst still warm from test (5) an alternating voltage of 205 shall be applied, through a lamp, between the windings (both) and the base, for one minute without break-down.

(7) The final test of this relay switch unit is to consist of testing under approximate operating conditions as described in Section III.

EFC.

8781
8650
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙