From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of a moulded Redmanol case for the ignition coil to reduce cost and improve appearance.
Identifier | ExFiles\Box 172\3\ img091 | |
Date | 31th May 1926 | |
RR 755 (10M) (DB{Donald Bastow - Suspensions}130 12-9-24) MS 301225 COMPLETED 14.6.26 STANDARDISATION of CHASSIS PARTS. Date 31.5.26 X No. 4079 Drawing No. Part List Description of Parts: Moulded Redmanol Case for Ignition Coil. Origin: Reduction in cost of manufacture and improvement in appearance of coil. Experimental Test Report. See EFC1/T4.10.24, EFC3/T 4.5.24, EFC2/T23.9.25, EFC2/T4.3.26., in addition to which a finer primary winding coil in Redmanol case has recently completed a 10,000 miles test on chassis 10-G-111 with entirely satisfactory results. In all, this coil has done 14,000 miles. A further Redmanol encased coil (with standard winding) not explicitly mentioned in our previous reports. Road Test Report. has now completed 23,200 miles satisfactorily. The moulding plant at the Works has ample capacity to produce these coil cases. It is proposed to make a simple production test to ensure the quality of Redmanol remains constant. Weight of Old Part. Weight of New Part. Difference per Car. Cost of Old Part. 12s. 11d. Cost of New Part. 10s. 0d. Difference per Car. 2s. 11d. saving. Signature of Mr. De LOOZE that above is correct. M de L / RR. 3.6.26 [Options] A Scrap and replace at all costs, including Chassis already delivered to customers. B Scrap and replace on Chassis in works. C Scrap present stock and replace on all Chassis not yet handed to rest. D Use existing stock Alterations effective on future Chassis. [X] Cost of Parts in Works which will be scrapped if commenced on:- Series.....£.......... Series.....£.......... Series.....£.......... SIGNATURES | DATE | REMARKS MR. C. JOHNSON | 4.6.26 | Agreed. CWB. MR. B. JOHNSON | 14.6.26 | Agreed. BJ. MR. ROYCE | 2/6/26 | Agreed - H.R - On condition that the above is purchased as a complete coil with present standard. MR. WORMALD | 1.6.26 | Agreed. Wor.{Arthur Wormald - General Works Manager} MR. ROWLEDGE | 9.6.26 | Agreed. Rg.{Mr Rowledge} MR. DAY | 3.6.26 | Agreed. Da.{Bernard Day - Chassis Design} MR. BAILEY | 2.6.26 | This change is dangerous - a change in quality or source of supply might easily land us in serious difficulty. I like the finish of the synthetic moulding, but think risk run is too high to justify a change. BY.{R.W. Bailey - Chief Engineer} MR. PLATFORD | 31.5.26 | Agreed. EP{G. Eric Platford - Chief Quality Engineer} MR. ELLIOTT | 2-6-26 | Agreed QE. MR. NORTHEY | 3.6.26 | Agreed. PN.{Mr Northey} MR. HIVES | 31.5.26 | Agreed. E.{Mr Elliott - Chief Engineer} Hives. | ||