Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Breakdown of labour hours for engine maintenance procedures including top and bottom decarbonisation.

Identifier  ExFiles\Box 107\2\  scan0124
Date  23th May 1938
  
- 3 -
Rm{William Robotham - Chief Engineer}/GWH.{George W. Hancock - Head Chateauroux}5/G.23.5.38.

There has been recurrent complaints after the above method has been carried out.

If a modification B. is carried out at the same time as a bottom decarburisation, the total labour hours are 100. (40½ hours extra).
Average Bottom decarburisation 59½ hours.

If a modification C. is carried out with a bottom decarburisation (.i.e. remove engine from the frame), the total average labour hours are 161½

There have been no recurrent cases during 12 months with this modification.

R.10
Top decarburisation ... labour hours 24½
15½ skilled
9 semi.

Nipping up of bearings in conjunction 46¾ hrs.
22 skilled
24¾ semi.
Total 71¼

Bottom decarburisation .. labour hours 59½
36 skilled
23½ semi.

Nipping up of bearing .. labour hours 40½
Total 100
52 skilled
48 semi

Bottom decarburisation and modification C.
106½ skilled
55 semi

Total labour hours 161½

Rm{William Robotham - Chief Engineer}/GWH.{George W. Hancock - Head Chateauroux}
  
  