Schemes for a synchro-mesh gearbox and its potential fitment to a 20/25 model.
| Identifier | WestWitteringFiles\V\March1931-September1931\ Scan260 | |
| Date | 15th June 1931 | |
| BY. {R.W. Bailey - Chief Engineer} FROM DA. {Bernard Day - Chassis Design} C. to EG. WOR. {Arthur Wormald - General Works Manager} C. to HS. {Lord Ernest Hives - Chair} HY. {Tom Haldenby - Plant Engineer} ORIGINAL DA {Bernard Day - Chassis Design} 1/M15.6.31. J. {Mr Johnson W.M.} 4. GEARBOX. JS {Mr Johnson's Secretary} 310 filed. We send herewith E. {Mr Elliott - Chief Engineer} schemes 3283/88. shewing respectively the gearbox with synchro-mesh actuation for top and third, and the actuating mechanism. In order to get power for the operation of the synchro-mesh we suggest that the travel of the gear lever should be increased to 4" each side of neutral on a 15" lever, and have arranged the leverages to correspond. This box can be fitted to an existing 20/25. by modification to the position of the cross members and some modification to the brake gear. DA. {Bernard Day - Chassis Design} [STAMP: RECEIVED 16 JUN 1931] | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
