Schemes for a synchro-mesh gearbox and its potential fitment to a 20/25 model.


Identifier  WestWitteringFiles\V\March1931-September1931\  Scan260
Date  15th June 1931
  
BY. {R.W. Bailey - Chief Engineer} FROM DA. {Bernard Day - Chassis Design}
C. to EG. WOR. {Arthur Wormald - General Works Manager}
C. to HS. {Lord Ernest Hives - Chair} HY. {Tom Haldenby - Plant Engineer}

ORIGINAL

DA {Bernard Day - Chassis Design} 1/M15.6.31.

J. {Mr Johnson W.M.} 4. GEARBOX.

JS {Mr Johnson's Secretary} 310 filed.

We send herewith E. {Mr Elliott - Chief Engineer} schemes 3283/88. shewing respectively the gearbox with synchro-mesh actuation for top and third, and the actuating mechanism.

In order to get power for the operation of the synchro-mesh we suggest that the travel of the gear lever should be increased to 4" each side of neutral on a 15" lever, and have arranged the leverages to correspond.

This box can be fitted to an existing 20/25. by modification to the position of the cross members and some modification to the brake gear.

DA. {Bernard Day - Chassis Design}

[STAMP: RECEIVED 16 JUN 1931]
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙