From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of chassis parts for centralised lubrication to the front axle.
Identifier | ExFiles\Box 141\2\ scan0015 | |
Date | 14th January 1931 | |
RR 755 (10H) (3-7-30) BM. 6/2571. V3806 COMPLETED 10.12.31. STANDARDISATION of CHASSIS PARTS. Date 14.1.31. Description of Parts. Centralised lubrication to Front Axle. Origin. To bring the front axle lubrication in with the one shot lubrication scheme. Experimental Test Report. Fitted to 18.G.IV. The lay out is satisfactory and brings the lubrication under the one shot scheme. Road Test Report. Fitted to 18.G.IV. and ran 10,000 miles. The front axle mechanism has been amply lubricated There has been no trouble with the arrangement. Box X is ticked: A Scrap and replace at all costs, including Chassis already delivered to Customers. B Scrap and replace on Chassis in Works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. X No. X.3806. Drawing No. NS{Norman Scott}3141. No. NS{Norman Scott}3135. Part List Weight of Old Part. Cost of Old Part. £ 19-18-3 Weight of New Part. Cost of New Part. £ 22-6-3 Difference per Car. Difference per Car. £ 2-8-0 Increase Handwritten notes next to cost: Also covers, Rear Axle, Brake Mechanism. Signature from Cost Dept. that above is correct. GRH 4/12/31 Cost of Parts in Works which will be scrapped if commenced on:— Series.........£..... Series.........£..... Series.........£..... INITIAL DATE REMARKS SG.{Arthur F. Sidgreaves - MD} 7-12-31. Agreed Sg.{Arthur F. Sidgreaves - MD} R.{Sir Henry Royce} 18.1.31. Agreed FHR. WOR.{Arthur Wormald - General Works Manager} 16.1.31. Agreed Wor.{Arthur Wormald - General Works Manager} C. 16.1.31. Agreed C. RG.{Mr Rowledge} 15.1.31. Agreed Rg.{Mr Rowledge} DA.{Bernard Day - Chassis Design} 21.1.31. Agreed HX. Da.{Bernard Day - Chassis Design} BY.{R.W. Bailey - Chief Engineer} 16.1.31. Agreed By.{R.W. Bailey - Chief Engineer} EP.{G. Eric Platford - Chief Quality Engineer} 16.1.31. Agreed EP.{G. Eric Platford - Chief Quality Engineer} E.{Mr Elliott - Chief Engineer} 17.1.31. Agreed AE. PN.{Mr Northey} 21.1.31. Agreed PN.{Mr Northey} HS.{Lord Ernest Hives - Chair} Agreed Hs.{Lord Ernest Hives - Chair} Stamp: 20/25 H.P. Stamp: RECEIVED 5 DEC 1931 | ||