Revised standard cost sheet for allowed time and burden on an assembly process.

Identifier  ExFiles\Box 43\2\  Scan252
Date  7th March 1934
  
ALLOWED TIME & BURDEN
49/50 TYPE
REVISED STANDARD
SHEET NO. G.{Mr Griffiths - Chief Accountant / Mr Gnapp} 2158.A
ASSEMBLY NO. G.{Mr Griffiths - Chief Accountant / Mr Gnapp} 2158.A
K48.0. G.2131. G.2158. ASSEMBLING
B. 2CR{Mr Cra???ster / Mr Chichester}
1CX{Major Len W. Cox - Advertising Manager} LABOUR. R
Column Headers: TOTAL OPERATING ALLOWED TIME, TOTAL SET-UP ALLOWED TIME, TOTAL ALLOWED TIME, DATE, RATE, BURDEN AMOUNT, LABOUR TOTAL
Stamp: ENGINEER'S DEPT RECEIVED 7 MAR 1934

Data:
B.O.
8.00
.46
8.
H/S
8.46
C/F
0.502
4.25
5.16
30.00
30.
30.
0.172
5.16
7.00
7.
7.
0.214
1.50
2.00
1.50
3.50
3.50
0.170
0.60
40.00
40.
40.
0.149
5.96
12.00
12.
12.
0.238
2.86
10.00
2CR{Mr Cra???ster / Mr Chichester}
10.00
1.20
20.
2.40
2.50H
1
1 H/S
21.
2.50 H/S
.483
0.236
5.06
1.21

Totals:
1.26
1.23.
1.88
124.88
26.60

TOTAL COST
MATERIALS
  
  