From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Revised standard cost sheet for allowed time and burden on an assembly process.
Identifier | ExFiles\Box 43\2\ Scan252 | |
Date | 7th March 1934 | |
ALLOWED TIME & BURDEN 49/50 TYPE REVISED STANDARD SHEET NO. G.{Mr Griffiths - Chief Accountant / Mr Gnapp} 2158.A ASSEMBLY NO. G.{Mr Griffiths - Chief Accountant / Mr Gnapp} 2158.A K48.0. G.2131. G.2158. ASSEMBLING B. 2CR{Mr Cra???ster / Mr Chichester} 1CX{Major Len W. Cox - Advertising Manager} LABOUR. R Column Headers: TOTAL OPERATING ALLOWED TIME, TOTAL SET-UP ALLOWED TIME, TOTAL ALLOWED TIME, DATE, RATE, BURDEN AMOUNT, LABOUR TOTAL Stamp: ENGINEER'S DEPT RECEIVED 7 MAR 1934 Data: B.O. 8.00 .46 8. H/S 8.46 C/F 0.502 4.25 5.16 30.00 30. 30. 0.172 5.16 7.00 7. 7. 0.214 1.50 2.00 1.50 3.50 3.50 0.170 0.60 40.00 40. 40. 0.149 5.96 12.00 12. 12. 0.238 2.86 10.00 2CR{Mr Cra???ster / Mr Chichester} 10.00 1.20 20. 2.40 2.50H 1 1 H/S 21. 2.50 H/S .483 0.236 5.06 1.21 Totals: 1.26 1.23. 1.88 124.88 26.60 TOTAL COST MATERIALS | ||