Modifications to the Wraith II brakes system.


Identifier  ExFiles\Box 7\7\  X 606 Brakes-page024
Date  7th September 1936
  
X404#
GRY {Shadwell Grylls} 606
BY. {R.W. Bailey - Chief Engineer}
c.c. E. {Mr Elliott - Chief Engineer} Ds. RHC. {R. H. Coverley - Production Engineer} Hs {Lord Ernest Hives - Chair} /Fm. E {Mr Elliott - Chief Engineer} /HDY. {William Hardy} 1/HP.7.9.36.

Wraith II Brakes.

We send herewith N.Sch.4894 showing the holes in the frame for the rods between the bell crank lever and the countershaft at the front end of the rear spring.

The hole at the rear end of the cross arm comes somewhat close to the edge of the material as shown by Lec.5101, and our suggestion is that this feature should be dealt with, as we show.

It will be seen that we have modified N.Sch's 4892 and 4852 in that the levers to which the rod is attached are both lengthened with the object of reducing the loads in the pieces concerned.

The stiffening piece for the bell crank lever brackets is modified to clear the longer lever.

The upper lever on the bell crank lever shaft has been dropped approximately .450. The upper bracket comes down the same amount.

A modification to the stop pin is shown for increased strength.

The brake levers are to have a section as nearly rectangular as it is practicable to forge them.

N.Sch.4894. E {Mr Elliott - Chief Engineer} /HDY. {William Hardy}

* This should be applied to the first frames, if possible, but if not possible the feature objected to must be accepted to begin with.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙