Standardisation proposal for side steering tube ends.
Identifier | ExFiles\Box 56\4\ Scan050 | |
Date | 24th December 1926 | |
RR 755 REVISED (10H) (DE 444 6-10-26) BM. X. 5450 COMPLETED 27.1.27 STANDARDISATION of CHASSIS PARTS. Date 24.12.26 Description of Parts. SIDE STEERING TUBE ENDS. Origin. To reduce joggles and road shocks. Experimental Test Report. This scheme enables lower rating springs with a longer travel to be employed. We consider that it should be brought into production instead of N.sch. 2067 as it gives better results. Road Test Report. We have tested this side steering tube and find it to be an improvement over N.sch. 2067. Road and bump tests will be completed before cars are passed off test. X No. 5450 Drawing No. N.sch. 2308 Part List A Scrap and replace at all costs, including Chassis already delivered to Customers. B Scrap and replace on Chassis in Works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. Weight of Old Part. Weight of New Part. Difference per Car. Cost of Old Part. £1. 4. 8d. Cost of New Part. £1. 10. 9d. Difference per Car. 6. 1d. increase. Signature from Cost Dept. that above is correct. My/Rb.{R. Bowen} 20.1.27 Cost of Parts in Works which will be scrapped if commenced on :- Series.........£....... Series.........£....... Series.........£....... TABLE OF SIGNATURES: INITIAL | DATE | REMARKS BJ. | 27.1.27 | agreed R.{Sir Henry Royce} | 28.12.26 | Agreed. FHR. (See notes on previous sheets) WOR.{Arthur Wormald - General Works Manager} | 31.12.26 | Agreed. Wor.{Arthur Wormald - General Works Manager} RG.{Mr Rowledge} | 29.12.26 | Agreed. Rg.{Mr Rowledge} DA.{Bernard Day - Chassis Design} | 31.12.26 | Agreed. Da.{Bernard Day - Chassis Design} Subject to tests being satisfactory. BY.{R.W. Bailey - Chief Engineer} | 24.12.26 | Agreed. BY.{R.W. Bailey - Chief Engineer} EP.{G. Eric Platford - Chief Quality Engineer} | 24.12.26 | Agreed - Should be embodied as quick as possible. Present standard not satisfactory. EP.{G. Eric Platford - Chief Quality Engineer} E.{Mr Elliott - Chief Engineer} | 1.1.27 | Agreed. E.{Mr Elliott - Chief Engineer} PN.{Mr Northey} | 12.1.27 | Agreed. PN.{Mr Northey} CWB. | 30.12.26 | Agreed. CWB. Hs.{Lord Ernest Hives - Chair} | 24.12.26 | Agreed. Hs.{Lord Ernest Hives - Chair} STAMPS: CHASSIS RECEIVED 29 JAN 1927 HANDWRITTEN NOTES (LEFT MARGIN): Please let me know what has been made | ||