From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of servo operating levers and ball bearing cams for the chassis.

Identifier  ExFiles\Box 16\3\  Scan096
Date  26th September 1931
  
RR 78B (10M) (8459. 24-10-30) 6/3185.
COMPLETED 4.4.32.
STANDARDISATION of CHASSIS PARTS.
Date 26.9.31
X No. 7370

Description of Parts.
SERVO OPERATING LEVERS 43º BALL BEARING CAMS.

Origin.
To facilitate production and obtain smooth working cams.

Experimental Test Report. Road Test Report

Fitted to 25-EX for test in France.

Fitted to 25-EX and ran 20,000 miles in France. Servo operation throughout the mileage was very smooth - requires no automatic oiling.

Drawing No.
Part List
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.

Weight of Old Part.
Weight of New Part.
Difference per Car.

Cost of Old Part. £ 1-5-5
Cost of New Part. £ - 18-9
Difference per Car. £ 0-6-8 Decrease

Cost of Parts in Works which will be scrapped if commenced on:-
Series..........£.........
Series..........£.........
Series..........£.........

Signature from Cost Dept. that above is correct. GRL 24/3/32. G31/3/32.

INITIAL | DATE | REMARKS
SG.{Arthur F. Sidgreaves - MD} | 1-4-32 | agreed Sg{Arthur F. Sidgreaves - MD}
R.{Sir Henry Royce} | 3.10.31 | Agreed FHR.
WOR.{Arthur Wormald - General Works Manager} | 30.9.31 | Agreed Wor.{Arthur Wormald - General Works Manager}
C. | 30.9.31 | Agreed C.
RG.{Mr Rowledge} | 7.10.31 | Agreed Rg.{Mr Rowledge}
DA.{Bernard Day - Chassis Design} | 2.10.31 | Agreed Da.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer} | 11.1.32 | Agreed By.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer} | 5.10.31 | Agreed EP.{G. Eric Platford - Chief Quality Engineer}
E.{Mr Elliott - Chief Engineer} | 5.10.31 | Agreed AE.
PN.{Mr Northey} | 30.9.31 | Agreed PN.{Mr Northey}
HS.{Lord Ernest Hives - Chair} | | Agreed.
  
  