From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of Dunlop wire wheels with straight spokes on the inside.
Identifier | ExFiles\Box 171\3\ img179 | |
Date | 2nd July 1923 | |
R.R. 753 (5 H) (S.J. 291. 12-10-21) G.{Mr Griffiths - Chief Accountant / Mr Gnapp} 2027. ORIGINAL COMPLETED 13.7.23. STANDARDISATION of CHASSIS PARTS. Date 2.7.23 X No. 3982 Description of Parts. DUNLOP WIRE WHEELS WITH STRAIGHT SPOKES ON THE INSIDE. Drawing No. Part List Origin. To reduce spoke failures. Experimental Test Report. Our experience proves that we get most spoke failures with the inside spokes which take most of the driving and braking. The wheels are inter-changeable with the present standard. Road Test Report. Run 3500 miles on 4-EX. The same wheels have run 2750 miles on 6-EX car. We recommend we take advantage of this improvement which is recommended by Messrs. Dunlop. A Scrap and replace at all costs, including Chassis already delivered to customers. B Scrap and replace on Chassis in works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. Cost of Parts in Works which will be scrapped if commenced on :- Series....... £........ Series....... £........ Series....... £........ Storekeeper advised re above: Storekeeper's Signature Signature of Exp. Dept. that above is correct. E.{Mr Elliott - Chief Engineer} Hives. Weight of Old Part. Cost of Old Part. £ Weight of New Part. Cost of New Part. £ Difference per Car. Difference per Car. £ No difference in cost. Signature of Mr. De LOOSE that above is correct. WN/JW 3.7.23. SIGNATURES | DATE | REMARKS Mr. JOHNSON | 12.7.23 | Agreed. CJ. Mr. B. Johnson. | 12.7.23 | Agreed. BJ. Mr. ROYCE | 6/7/23 | Agreed. FHR Mr. WORMALD | 9.7.23 | Agreed. Wor.{Arthur Wormald - General Works Manager} Mr. ROWLEDGE | 2.7.23 | Agreed. Rg.{Mr Rowledge} Mr. DAY | 3.7.23 | agreed Da{Bernard Day - Chassis Design} Mr. BAILEY | 2.7.23 | Agreed. BY.{R.W. Bailey - Chief Engineer} Mr. PLATFORD | 3.7.23 | Agreed. EP.{G. Eric Platford - Chief Quality Engineer} Mr. NORTHEY | 3.7.23 | Agreed. PN.{Mr Northey} | ||