Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Millwright's requisition to make an adaptor for a 25/30 Ignition rig to test distributions.

Identifier  ExFiles\Box 167\2\  img064
Date  3rd September 1937
  
RR/56 (100M) 43021 14-8-37) G.C.B. TO EQUIPMENT DEPARTMENT,
MILLWRIGHT'S REQUISITION.
This Requisition is to be used for work estimated to cost over 30/- and under £50.
Date Issued: 3/9/37
Date Commenced:
Work Required: Will you please make an adaptor for our 25/30 Ignition rig, which will enable us to test Distributions made to LEC.5694
Equipment Dept. Approval
Estimate to be filled in before work leaves Equipment Dept.
COST.
ESTIMATED ACTUAL
Labour
Material
Total
ESTIMATE APPROVED.
Supervisor or Works Manager.
Millwright
Signature (Full Name): R.{Sir Henry Royce} Mc. Child (Foreman)
Dept. 52
Approved (Full Name): C.R. Griffis (Royds) (Supervisor if work is under £10) (Works Manager if over £10)
Foreman Millwright
6103.
O/N 4803/B
  
  