Standardisation of a radiator with .312' hexagon copper tubes for more efficient cooling.


Identifier  ExFiles\Box 16\2\  Scan050
Date  26th September 1931
  
RR 755 (10M) (8459, 24-10-30) 6/3165.
X7250 COMPLETED 5.11.31
STANDARDISATION of CHASSIS PARTS.
Date 26.9.31

Description of Parts.
RADIATOR WITH .312" HEXAGON COPPER TUBES.

Origin.
To obtain more efficient cooling.

Experimental Test Report.
Fitted to 25-EX for tests in France.

Road Test Report.
Fitted to 25-EX and run 15,000 miles in France. There was a decided improvement in the reduction of temperature. Cases of boiling have occurred at slow speeds. with high air temperature.

[Stamped across Experimental and Road Test Reports: PHANTOM]

Weight of Old Part.
Weight of New Part.
Difference per Car.

Cost of Old Part. £ 10-2-0
Cost of New Part. £ 6-10-11
Difference per Car. £ 3-11-1

Signature from Cost Dept. that above is correct. GJR 24/10/31

[Top Right Box]
X No. X.7250
LOP.
Drawing No. E.81428, E.81407
Part List E.82520
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.

Cost of Parts in Works which will be scrapped if commenced on :-
Series.........£.........
Series.........£.........
Series.........£.........

[Approval Table]
INITIAL | DATE | REMARKS
SG. {Arthur F. Sidgreaves - MD} | 3-11-31. | Agreed SG. {Arthur F. Sidgreaves - MD}
R. {Sir Henry Royce} | 3.10.31. | Agreed FHR.
WOR. {Arthur Wormald - General Works Manager} | 30.9.31. | Agreed Wor. {Arthur Wormald - General Works Manager}
C. | 30.9.31. | Agreed C.
RG. {Mr Rowledge} | 7.10.31. | Agreed Rg. {Mr Rowledge}
DA. {Bernard Day - Chassis Design} | 2.10.31. | Agreed Da. {Bernard Day - Chassis Design}
BY. {R.W. Bailey - Chief Engineer} | 30.9.31. | Agreed By. {R.W. Bailey - Chief Engineer}
EP. {G. Eric Platford - Chief Quality Engineer} | 5.10.31. | Agreed EP. {G. Eric Platford - Chief Quality Engineer}
E. {Mr Elliott - Chief Engineer} | 5.10.31. | Agreed AE.
PN. {Mr Northey} | 30.9.31. | Agreed. I am thankful for small mercies, but wish we could have gone one better, our margin remains still too small. PN. {Mr Northey}
HS. {Lord Ernest Hives - Chair} | | Agreed

[Stamps near signature]
Round Stamp: RECEIVED 3 NOV 1931 Accounts
Rectangular Stamp: Cost Dept. 24 OCT 1931
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙