Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of chassis parts for rear brakes with a flexible toe.

Identifier  ExFiles\Box 12\5\  05-page311
Date  25th September 1931
  
RR 785 (10H) (8459, 24-10-30) 6/3185.
x7360. COMPLETED 20.11.31.
STANDARDISATION of CHASSIS PARTS.
Date 25.9.31.
Description of Parts. Rear Brakes with Flexible Toe.
X No. 7360.
Drawing No. G.78278.
Part List No. G.78624.
Origin. To reduce tendency of groans.
Experimental Test Report.
Fitted to 25-EX. for tests in France.
Road Test Report.
Fitted to 25-EX. and ran 20,000 miles in France. Slight groans developed at 10,000 miles, cured by replacing loading springs under flexible toe. No further groans during mileage.
[STAMP: RECEIVED 9 NOV 1931 J.S.L]
[STAMP: CANCELLED]
Weight of Old Part.
Weight of New Part.
Difference per Car.
Cost of Old Part. £ 3 - 5 - 10
Cost of New Part. £ 3 - 13 - 6
Difference per Car. £ - 7 - 8 increase
Signature from Cost Dept. that above is correct GTR 5/11/31. C 9/11/31
Side Box Options:
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test. [X marked]
D Use existing stock Alteration effective on future Chassis.
Cost of Parts in Works which will be scrapped if commenced on:-
Series.........£.......
Series.........£.......
Series.........£.......
INITIAL, DATE, REMARKS
SG.{Arthur F. Sidgreaves - MD}, 9-11-31, Agreed SG.{Arthur F. Sidgreaves - MD}
R.{Sir Henry Royce}, 3.10.31, Agreed. Pivoted two. FHR.
WOR.{Arthur Wormald - General Works Manager}, 28.9.31, Agreed Wor.{Arthur Wormald - General Works Manager}
C., 30.9.31, Agreed C.
RG.{Mr Rowledge}, 7.10.31, Agreed Rg.{Mr Rowledge}
DA.{Bernard Day - Chassis Design}, 29.9.31, Agreed Da.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer}, 29.9.31, Agreed By.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer}, 5.10.31, Agreed - much better but still slight on rear "pull up".
E.{Mr Elliott - Chief Engineer}, 28.9.31, Agreed AE.
PN.{Mr Northey}, 30.9.31, Agreed PN.{Mr Northey}
Hs.{Lord Ernest Hives - Chair}, 30.9.31, Agreed Hs.{Lord Ernest Hives - Chair}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙