Status report on various dynamos, detailing actions taken such as overhauls, adjustments, and repairs.
| Identifier | ExFiles\Box 70\3\ scan0027 | |
| Date | 4th September 1931 | |
| -3- EJBL/EC.4.9.31. 1047. GDK.15. Clean and adjust. 1568. GAJ.27. Increase output as high as possible. P.9.Km. GFK.79. Overhaul. Phantom Dynamos. UN.85. 92.LC. Overhauled. HX.35NB. 11.OR. Overhauled. LH. {Mr Haworth} 2.M. 24.EX. Low output. TC.65. 11.EX. Overhauled. FS. {F. Steele} 85. 104.GN. Overhauled. LS.35SS. {S. Smith} 130.GN. Taken from stock. Test for output. RO. {C. C. Rose - Export Manager} 85. 63.O.R. Armature burnt out. Rewound. 13.NB.HO.M. 90.EH. Brush Sing. SI.25. 20.SC. Armature earthed. Rewound. SI.95. 75.SC. Overhauled. US.25. 77.TC. Low output. Light overhaul. VK.45.ss. {S. Smith} 3.WJ. Quietened brushes. E.J.Brock. | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
