Standardisation of cotton 'A' fabric linings for torque reaction dampers on the 20/25 HP chassis to reduce booming.
| Identifier | ExFiles\Box 104\1\ scan0106 | |
| Date | 18th December 1930 | |
| RR 788 (10H) (3-7-30) BM. 6/2571. COMPLETED 3.3.31. Y5005. STANDARDISATION of CHASSIS PARTS. Date 18.12.30. Description of Parts. Cotton 'A' Fabric Linings for Torque Reaction Dampers. 20/25 HP. Origin. To reduce booming at 48 - 52 M.P.H. Experimental Test Report. Fitted to 14-G4, 17-G4, 18-G4 with beneficial results. The original damper setting is retained longer than when Ferodo friction discs are used. Road Test Report. At present completing 10,000 miles test on 18-G4. X No. X.634. X.5005. Drawing No. Part List A Scrap and replace at all costs, including Chassis already delivered to Customers. B Scrap and replace on Chassis in Works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. Weight of Old Part. Cost of Old Part. £ -. 2. 7d. Weight of New Part. Cost of New Part. £ -. 2. 7d. Difference per Car. Difference per Car. £ Nil. Cost of Parts in Works which will be scrapped if commenced on :- Series.........£......... Series.........£......... Series.........£......... Signature from Cost Dept. that above is correct. G {Mr Griffiths - Chief Accountant / Mr Gnapp} /Rb. {R. Bowen} 26.2.31. G.27.2.31. Wor. {Arthur Wormald - General Works Manager} STAMP: 20/25 HP CHASSIS INITIAL | DATE | REMARKS SG. {Arthur F. Sidgreaves - MD} | 2.3.31. | Agreed Sg. {Arthur F. Sidgreaves - MD} R. {Sir Henry Royce} | 21.2.31. | Agreed FHR. WOR. {Arthur Wormald - General Works Manager} | 19.2.31. | Agreed Wor. {Arthur Wormald - General Works Manager} C. | 22.12.30 | Agreed C. RG. {Mr Rowledge} | 19.12.30 | Agreed Rg. {Mr Rowledge} DA. {Bernard Day - Chassis Design} | 22.12.30 | Agreed Da. {Bernard Day - Chassis Design} BY. {R.W. Bailey - Chief Engineer} | 22.12.30 | Agreed BY. {R.W. Bailey - Chief Engineer} EP. {G. Eric Platford - Chief Quality Engineer} | 19.12.30 | Agreed EP. {G. Eric Platford - Chief Quality Engineer} and MX. {John H Maddocks - Chief Proving Officer} E. {Mr Elliott - Chief Engineer} | 22.12.30 | Agreed AE. PN. {Mr Northey} | 23.12.30 | Agreed PN. {Mr Northey} HS. {Lord Ernest Hives - Chair} | | Agreed Hs {Lord Ernest Hives - Chair} /Rn. {Mr Robinson} (Hs. {Lord Ernest Hives - Chair} away). | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
