From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Continued list of chassis test operations for a 20/25 HP vehicle with time allowances.
Identifier | ExFiles\Box 1\8\ B001_X100 Engine Chassis-page133 | |
Date | 30th November 1932 | |
-2- F.58510 - CHASSIS TEST - 20/25 HP. (Cont'd). 30.11.32. T.Allow. H.{Arthur M. Hanbury - Head Complaints} M.{Mr Moon / Mr Moore} 21. Fitter Testers time on final test. 4 30 22. Tighten all spring clips, attend to all jobs on inspection card (Mr.Waldron) and inspectors report. 4 21 23. Electrical inspection. 4 30 24. Dismantle and re-erect step irons. - 27 25. Quieten engine gears. 35 - Handwritten note: Spg admits should not be included in test 26. Cancelled. 26a. Inspect Battery Box Wiring 'U' Series. 1 - 27. Cancelled. 28. Engine unit test. 10 48 29. Dynomometer test. 17 6 29a. Contract testers and inspectors. 23 - 30. Dynomometer power curve. 7 12 31. Dynomometer gear box. 7 12 32. Dynomometer axle. 3 9 33. Cancelled. 34. Change valve springs and re-set tappets (per spring). - 15 35. Dismantle steering column. 1 48 36. Erecting steering column. 4 3 37. Check timing after change of steering. 1 30 Handwritten note: Operation when nec. 38. Dismantle both exhaust and inlet pipes, fit new washers and re-erect. 1 21 39. Dismantle clutch springs, fit washers and re-erect. 1 48 40. Dismantle rear drum for enamel(per drum). - 54 41. Erect rear drum after enamel(per drum). 1 3 42. Dismantle and re-erect carb. - 45 43. Dismantle front pan, oil pump and feed pipe, remove valve from pump, clean, grind in and re-assemble, re-erect pipe, pump and front pan and test pump for pressure. 2 29 43a. Lubricating front axle in place of op.7. Fitting up Bijur Lubrication. - 54 | ||