From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Awaiting the receipt of signed standardisation sheets to process cost figures.
Identifier | ExFiles\Box 154a\3\ scan0042 | |
Date | 14th March 1932 | |
To Hs.{Lord Ernest Hives - Chair} from G/Rb.{R. Bowen} X3066. G/Rb{R. Bowen}/ABM.13/139B1/EP.{G. Eric Platford - Chief Quality Engineer}14.3.32. Re: Standardisation Sheets. ---------------------- Please note we await the receipt of the signed copy of the following standardisation sheets, in order that we may pass through the figures of cost. Will you kindly urge delivery of the sheets. in question. Rear Brake Equalising shaft to suit Synchro Mesh Gear-box x.5330/5310. BY.{R.W. Bailey - Chief Engineer} Reversion to Double ended jaw Spanners for Car Tool kits. x.5580/7580. R.{Sir Henry Royce} Wheelcase to suit low inertia Spring Drive. x.5020/5170. BY.{R.W. Bailey - Chief Engineer} Low inertia spring drive incorporated with balanced crankshaft. x.5020/5010. BY.{R.W. Bailey - Chief Engineer} Balanced Crankshaft. Nose piece to suit low inertia slipper wheel and rear flange to suit thin web flywheel. x.5010 BY.{R.W. Bailey - Chief Engineer} Exhaust Fittings. X.5230. BY.{R.W. Bailey - Chief Engineer} [STAMP: RECEIVED 26 MAR 1932] G/Rb.{R. Bowen} [Initialed signature] | ||