Rolls-Royce Archives
         « Prev  Box Series  Next »        

Modification to the Phantom magneto coupling to aid in timing adjustment.


Identifier  WestWitteringFiles\Q\April1927-June1927\  97
Date  26th May 1927
  
TO BM. FROM E. {Mr Elliott - Chief Engineer}
C. to PL HS. {Lord Ernest Hives - Chair}
PHANTOM MAGNETO COUPLING. X.4017

We send herewith drawing LeC. 2416. shewing a modification to facilitate the adjustment of the magneto timing.

We understand that in the usual way the magneto coupling nut is freed against the resistance of the timing gear spring drive, but with this method of undoing the coupling the position of the magneto timing might be lost if the cone should come free without being knocked. It is therefore thought to be an advantage to provide some means of holding the coupling.

The fixed spanner shewn is the largest one of the standard RR. series.

E. {Mr Elliott - Chief Engineer}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙