Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Design and operation of a new cutout mechanism, contrasting it with the Phantom model.

Identifier  WestWitteringFiles\Q\January1927-March1927\  44
Date  20th January 1927
  
TO BY.{R.W. Bailey - Chief Engineer} FROM DA.{Bernard Day - Chassis Design}
C. to --BJ. HS.{Lord Ernest Hives - Chair}

EAC. 7. CUTOUT OPERATION. X7490 X7310

Herewith we send N. schs. 2341/2. shewing the cutout operation.

It will be seen that it follows the lines of that recently instructed for Phantom, but on account of the different arrangement of cross members, and the relatively higher position of the gearbox it has not been found possible to keep it exactly like Phantom.

In order to make the mechanism as accessible as possible, in spite of the heat shield over the silencer, we have turned the levers on the silencer support up the other way.

On N. sch. 2341. it is intended thatthe pot in which the pedal works should be periodically cleaned out by detaching the front cover.

It will be seen that we have modified the front support for the gearbox, but this is not intended to apply to the first car.

In order to get this cutout on to the existing car we have made N. sch. 2344. (herewith) shewing a specially screwed on pad, as we considered it would be impossible to use the gearbox bolt as indicated on N. sch. 2341.

DA.{Bernard Day - Chassis Design}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙