Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Testing and failure points of rear shock absorbers during a 100-hour trial.

Identifier  ExFiles\Box 55\4\  Scan294
Date  1st January 1929 guessed
  
contd :- -3-

REAR SHOCK ABSORBERS.

These were fitted when the rear of the car had already done 57 hrs. 45 mins. on the drums.

Conditions : Tyres at 60 lbs/sq.in. Spare wheel carrier with 2 wheels.
Total ballast of 580 lbs. 8 restriction washers.

After 45 mins. Piston F.79723 in N.S.R. damper broke.

* 22 hrs. 15 mins. N.S.R. damper bracket near buffer broke. Piston F.79723 found broken and replaced.

* 38 hrs. 30 mins. outside lever F.79757 of O.S.R. damper broke.

Both dampers finished the remaining 3 1/4 hrs. to complete the 100 hrs. with rear wheels bumped.

------------

Chart attc. Hs{Lord Ernest Hives - Chair}/Tsn.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙