Query regarding the short pull rod for the magneto controls on a 20 HP chassis.
| Identifier | ExFiles\Box 76\2\ scan0187 | |
| Date | 24th August 1923 | |
| To Hs. {Lord Ernest Hives - Chair} X4327 BY {R.W. Bailey - Chief Engineer} /Shnl/DB. {Donald Bastow - Suspensions} 24.8.23. RE 20 HP CHASSIS - RO {C. C. Rose - Export Manager} 1 MAGNETO CONTROLS. With reference to the short pull rod which connects the magneto Advance and Retard lever to the last lever on our control system, have you yet finally decided whether this should be always coupled up complete or one end left loose? If the latter case is decided upon, where do you purpose to anchor same to prevent rattles? Have W.W. made any reference to this matter at any time? BY {R.W. Bailey - Chief Engineer} /Shn. | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
