Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Cost estimate and production timeline for new dies for a Phantom III frame bracket for an oil cooler.

Identifier  ExFiles\Box 171\2\  img347
Date  1st November 1938
  
PHANTOM III STANDARDISATION of PARTS
Description. Part No. FRAME BRACKET FOR OIL COOLER
Origin
Report from Experimental Dept.
Estimated cost of new dies ......£14. 0. 0.
Could be brought on to production at the 1st. chassis in "E" Series (without scrap)

TABLE 1:
MATERIAL s. d.{John DeLooze - Company Secretary}
LABOUR s. d.{John DeLooze - Company Secretary}
CHARGES s. d.{John DeLooze - Company Secretary}
TOTAL s. d.{John DeLooze - Company Secretary}
Cost of Old Part: 11, 8, 1 4, 3 1
Cost of New Part: 1 0, 1 2, 1 4, 3 6
New amount
Saving

Signature from Con. Dept. that above is correct.

TABLE 2:
INITIAL, DATE, REMARKS
SC, 1.11.38, Passed.
HS{Lord Ernest Hives - Chair}, 1.11.38, Passed.
C, 1.11.38, Passed.
BY, 2.11.38, Passed.
AQ, 2.11.38, Passed.
RHC{R. H. Coverley - Production Engineer}, 2.11.38, Passed.
XM, 2.11.38, Passed.
RM{William Robotham - Chief Engineer}, 3.11.38, Passed.

BOX:
Date 1.11.38
X.1500
Drawing No. X
Sch. No.
Ref.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙