Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Instructions and diagrams for adjusting ring gear, pinion lash, and servicing the propeller shaft assembly.

Identifier  ExFiles\Box 126\1\  scan0016
Date  28th June 1937 guessed
  
1062
TOOL NO. H.M.575

Fig. 83-23. Adjusting Ring Gear and Pinion Lash

15. Install adjusting nut locks and cap screws.
16. Lead gear teeth, then roll pinion and gear to show tooth contact. If tooth contact is such that noise is apt to be produced as described on page 65, readjust as outlined in 1, 2 and 3 on pages 65 and 66.

it is definitely known that the lubricant in the differential and that being added is the same brand.
5. Connect propeller shaft at rear companion flange, using new cap screw locks.
6. Road test car for gear noise.

SERVICING PROPELLER SHAFT AND UNIVERSAL JOINTS

It will seldom be necessary to disassemble the universal joint. However, when it is disassembled all parts should be thoroughly washed and the reservoir in each journal of the spider filled with S.A.E. 160 oil before

[Diagram Labels]
SHIELD
PROPELLER SHAFT
RUBBER BEARING RETAINER
BEARING SUPPORT HOUSING
BEARING SUPPORT
SLINGER
COMPANION FLANGE
PLAIN WASHER
CAP SCREW
LUBRICATION FITTING
ARROWS ON TUBE AND YOKE MUST BE IN LINE WHEN ASSEMBLED
TUBE
YOKE
ROLLER BEARING

Fig. 84-24. Propeller Shaft Assembly

[Faint text]
X.85506
DRL. 17.6.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙