Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Graph showing injection period and pump lag against pump speed, with and without an air vessel.

Identifier  ExFiles\Box 179b\3\  img116
Date  1st February 1933 guessed
  
R.R. COMBINED PUMP & INJECTOR
INJECTION PERIOD & PUMP LAG-SPEED CURVES.
ALL SUCTION CHAMBER HOLES PLUGGED EXCEPT ONE
OPPOSITE SUPPLY PIPE. HOLE No.1. FIG:1.
STANDARD CONDITIONS AS ON DELIVERY CURVE. FIG:5
INJECTION QUANTITY NORMAL (0.240 CCS/CYCLE)
FIG. 1
PUMP ANGLE (°)
PUMP SPEED (RPM)
INJECTION PERIOD
PUMP LAG
WITH AIR VESSEL
WITHOUT AIR VESSEL
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙