Rolls-Royce Archives
         ยซ Prev  Box Series  Next ยป        

Status report on Bentley 'V' chassis builds, detailing completions and a list of outstanding parts for specific chassis numbers.


Identifier  ExFiles\Box 97\2\  scan0107
Date  20th October 1939
  
(1) 400
BENTLEY 'V' CHASSIS - Position 20.10.39.
Handwritten: (Rm {William Robotham - Chief Engineer} )
Handwritten: 4 Completed Cars in England.
(Built 25 - of which 10 have been despatched)
Handwritten: & Not despatch that have gearbox
Handwritten: 1 Corniche(Bentley streamline(Experimental Streamline Bentley B.23.A.E)d precursor to R Type Continental, never produced) complete in England

Chassis No. Despatched. Position.

B-12-AW 21-8-39 FRANCE. โœ“
INCOMPLETIONS:-
Litre Gauge for 22 Gallon Tank,
Brackets for Marchal Headlamps,
Petrol Tank Gauge Unit,
Front Wing Stays & Fittings,
Ferodo Strips for Bonnet Plates,
Wheel, Nuts,
Dip stick for Gear Box,
Balancing Material,
D.W.S. Portable Jack,
Jacking Attachment Brackets Etc.

B-10-AW 23-8-39 FRANCE. โœ“
INCOMPLETIONS:-
Near Side Wheel Carrier,
Connections for Airvin Heater,
Front Wing Stays etc,
Litre PETROL Gauge for 22 Gallon Tank,
Brackets for Marchal Headlamps,
Centre Bolt, Disc & Well Iron.
Dip Stick for Gear Box.
Balancing Material,
Wheel Nuts,
22 Gallon Petrol Tank Gauge Unit.
D.W.S. Portable Jack &
Jacking Attachment, Brackets etc.

contd.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload ๐Ÿ—™