Standardisation sheet for a fully floating bevel, detailing costs and production for extra tooling on the 'T' series chassis.
| Identifier | ExFiles\Box 171\2\ img161 | |
| Date | 18th May 1934 | |
| STANDARDISATION OF PARTS FULLY FLOATING BEVEL To obtain maximum stiffness. No splays in the hub lathes. Est. cost of extra jigs, tools and equipment (Sft {Mr Swift} /Ws.18.5.34) - £36.0.0. Could be brought on to production at 1st chassis in 'T' series, (Sft {Mr Swift} /GH.18.5.34). | ||