Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Timing and design of the Spectre Camshaft.

Identifier  ExFiles\Box 93\5\  scan0002
Date  11th June 1934
  
To E.{Mr Elliott - Chief Engineer}

+4647 307

Hs{Lord Ernest Hives - Chair}/Smth.18/KW.11.6.34.

SpectreCodename for Phantom III Camshaft.

On examination of our experience with Bentley and 20/25, we consider that in order to ensure good slow running, the overlap on the SpectreCodename for Phantom III camshaft as given on LeC.3855/6 should be reduced from 4º to 2º with .020" clearance. This should be done by making the exhaust cams to the same form as the inlet and adopting the following timing -

Timing with
.020 clearance.

Angle between
the cams = 114º.

[Diagram Data]
TDC
INLET 230º
EXHAUST 230º
Overlap: 2º
Inlet closes: 48º ABDC
Exhaust opens: 50º BBDC

In this manner we hope to get the best results using the cam forms available, but are of the opinion that the inlet cam duration is too long and should be redesigned to be similar to the 20/25.

Hs{Lord Ernest Hives - Chair}/Smth.
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙