Modifications, costs, and material specifications for various parts, primarily concerning the Phantom III model.

Identifier  ExFiles\Box 107\2\  scan0063
Date  30th November 1936 guessed
  
N 960
N 921
N891

3 CM 73
changed three times
143 sets ordered
53 sets D repair

14/12/33 3 BT{Capt. J. S. Burt - Engineer} 179
2/1/32 3 AX 3
5/1/35 SAZ96
24/4/35 3BU196
23/ S13011
10/3/ SB{Mr Bull/Mr Bannister}2
17/5/38 3BU21

PH III Flaring

Hardened .040 deep bearings were fitted to
11 in D series 1st Chassis 32 DL 22

7 sets have been sent to Southwood.

AC 9 material for Birsly bearings
Spring for relief valve PH III rocker shafts (Swindell)

MOD C 161 3/4 hrs labour cost 9 . 17 . 9 1/2

MOD B Bottom decarb 100/10/hrs for six bigends and mtg of journals £5 . 5 . 5 1/2

Plain bottom decarb 2 1/4/10/hrs £23 . 2 . 11 1/2
70/10/hrs 3 . 15 . 8

Top decarb and nippers up bearings £11 . 4 . 4 3/4 } all costs included.
loss to company £5 . 19 . 4 3/4

4" 6" 11" labour.

(4" 6" 11)

Brake shoes for replacements all cars.

1/2 studs breaking 25/30 & Bentley
Splines on PHIII road shafts are too long for driver dog
  
  