Standardisation of a scraper ring due to complaints of high oil consumption.
| Identifier | ExFiles\Box 86\1\ scan0226 | |
| Date | 27th November 1936 | |
| RR 755B (10H) 88620 12-8-35 W.H.K. 21800 COMPLETED 19.12.36. BENTLEY STANDARDISATION OF PARTS. Date 2.11.36. (handwritten: 27/11/36) No. 219. Drawing No. 60821. Description of Parts: SCRAPER RING. Origin: Complaints of high oil consumption. Report of Experimental Test. This type of scraper ring has a higher En value than existing scraper ring material so that with existing dimensions a higher cylinder wall pressure is obtained. There are no alterations to existing design E.60821, with this material rings to standard dimensions give 32.0 lbs/sq.in. wall pressure. These rings have run satisfactorily in France for 15,000 miles in 6-B-IV. MATERIAL £ s. d.{John DeLooze - Company Secretary} LABOUR £ s. d.{John DeLooze - Company Secretary} CHARGES £ s. d.{John DeLooze - Company Secretary} TOTAL £ s. d.{John DeLooze - Company Secretary} Cost of Old Part: 3 19 6 Cost of New Part: 4 0 6 Labour cost unaffected. Nett Increase: 1. 0. Signature from Cost Dept. that above is correct. GRH 24.11.36. INITIAL | DATE | REMARKS SG.{Arthur F. Sidgreaves - MD} | 18-12-36 | Agreed Sg.{Arthur F. Sidgreaves - MD} WOR.{Arthur Wormald - General Works Manager} Hs.{Lord Ernest Hives - Chair} | | Agreed Hs.{Lord Ernest Hives - Chair} C. | 30.11.36. | Agreed C. E.{Mr Elliott - Chief Engineer} | 30.11.36. | Agreed E.{Mr Elliott - Chief Engineer} DA.{Bernard Day - Chassis Design} | 30.11.36. | Agreed Da.{Bernard Day - Chassis Design} BY.{R.W. Bailey - Chief Engineer} | 1.12.36. | Agreed By.{R.W. Bailey - Chief Engineer} EP.{G. Eric Platford - Chief Quality Engineer} | 27.11.36. | Agreed EP.{G. Eric Platford - Chief Quality Engineer} SFT.{Mr Swift} | 30.11.36. | Agreed Sft.{Mr Swift} MX.{John H Maddocks - Chief Proving Officer} | 27.11.36. | Agreed Mx.{John H Maddocks - Chief Proving Officer} HSK Rm.{William Robotham - Chief Engineer} | 27.11.36. | Agreed Rm.{William Robotham - Chief Engineer} RHC.{R. H. Coverley - Production Engineer} | 30.11.36. | Agreed RHC.{R. H. Coverley - Production Engineer} | ||