Typed document outlining agreements on production methods, components, output rates, and costs.

Identifier  ExFiles\Box 148\2\  scan0273
Date  22th December 1939
  
-6-

EV.{Ivan Evernden - coachwork}4/JH.22.12.39.

(10) It was agreed that after a method of construction and designs are approved a sample body be built by hand.

(11) Dealt with by 7.

(12) After discussion it was agreed that we know only 2 door locks that are available, the silent-bloc and the overall. We prefer the latter.

(13) The rate of output was agreed to be 5,000 Bentley in 2 years i.e. 50 per week. 1,000 R.R. in 2 years i.e. 0 per week.

(14) A jig and tool cost of £50,000 is assumed.

Equipment of the factory of a permanent nature must not be added to the tool cost i.e. paint shop equipment etc.