From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation proposal for wider gap radiator tubes to prevent them from becoming blocked in service.
Identifier | ExFiles\Box 171\1\ img174 | |
Date | 16th August 1929 | |
RR 755 REVISED (10H) (D.C. 777-29-2-28) 315 C.L.Y. Completed 31.8.29. STANDARDISATION of CHASSIS PARTS. Date 16.8.29. Description of Parts: Wider Gap Radiator tubes. X No. 7250 Drawing No. Part List Origin: To reduce the possibility of radiators becoming blocked in service. F.2.B. series onwards. S. cars. Experimental Test Report. These tubes are 5t/7m/m.{Mr Moon / Mr Moore} as against the standard 6/7 m.m. tubes. They increase the water passage size 50%. Road Test Report. We have tested these tubes on the S.S. and can detect no loss in cooling efficiency. A similar test will be made on the Phantom before radiators are issued. Weight of Old Part. £ Cost of Old Part. £ Weight of New Part. £ Cost of New Part. £ Difference per Car. £ Difference per Car. £ Negligible. Wor.{Arthur Wormald - General Works Manager} Signature from Cost Dept. that above is correct. C/RD. 28.8.29. G.{Mr Griffiths - Chief Accountant / Mr Gnapp} A Scrap and replace at all costs, including Chassis already delivered to Customers. B Scrap and replace on Chassis in Works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. Cost of Parts in Works which will be scrapped if commenced on:- Series.....£..... Series.....£..... Series.....£..... INITIAL DATE REMARKS BJ. Sz. 29.8.29 Agreed Sz. R.{Sir Henry Royce} 21/8/29 Agreed JHR. WOR.{Arthur Wormald - General Works Manager} 19.8.29 Agreed. Very urgent. Wor.{Arthur Wormald - General Works Manager} RG.{Mr Rowledge} 20.8.29 Agreed Rg.{Mr Rowledge} DA.{Bernard Day - Chassis Design} 19.8.29 Agreed Da.{Bernard Day - Chassis Design} BY.{R.W. Bailey - Chief Engineer} 19.8.29 Agreed By.{R.W. Bailey - Chief Engineer} EP.{G. Eric Platford - Chief Quality Engineer} 17.8.29 Agreed EP.{G. Eric Platford - Chief Quality Engineer} E.{Mr Elliott - Chief Engineer} 21/8/29 Agreed AE. PN.{Mr Northey} 19.8.29 Agreed PN.{Mr Northey} CWB. 19.8.29 Agreed C. HS.{Lord Ernest Hives - Chair} 16.8.29 Agreed Hs.{Lord Ernest Hives - Chair} RY/Mtn. | ||