From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Summary report of vehicle component faults and repairs.
Identifier | ExFiles\Box 146\2\ scan0192 | |
Date | 14th April 1937 guessed | |
-13- 48. S.U. PETROL PUMP. March quarter C.C. C.P. Previous quarter C.C. 4 C.P. 4 Six months 4 4 Ph.III - 3.AZ.96 - 369 miles .-Pump leaks. 3.AZ.212 - 11000 Kms.- failure of modified (G5) pump car in owner hands Driver fitted spare pump which he possessed. There was a leakage past the G3 type diaphragms. 3.AX.199 - 1230 miles (Vice Depot) Failure of pump. Fitted a new pump. 35.BX - Bad petrol leak from double & single pumps. Removed the G3.type diaphragms which were leaking & fitted new G3 type in their place. 49. ELECTRIC HORNS DEFECTIVE March quarter C.C. I C.P. I Previous quarter C.C. 3 C.P. 3 Six months I 3 4 GUL.4 - 4744 Kms.- Fitted 2 new Melowtone Horns. 50. PRESS BUTTON OF ELECTRIC HORNS RATTLE. March quarter C.C. I C.P. I Previous quarter C.C. 2 C.P. 2 Six months 3 3 Ph. III - 3.AZ.212 - New car. 51. SPEEDOMETER CABLE NOISY March quarter C.C. I C.P. I Previous quarter C.C. I C.P. I Six months 2 2 3.AZ.140 - 6075 Kms.- Oiled the cable. | ||